The Larocque Group banner
 

Ontario Power Generations
Sir Adam Beck Power Tunnel No. 3
Niagara Falls

We surveyed the limits of lands outlined in blue. The extent of title is over 8 kilometres in length. The lands below ground are going to be bored and Tunnel No. 3 is going to be constructed to provide water to Sir Adam Beck to generate power for the Province of Ontario.
tunnel no.3

 


BACK TO TOP